Friday, July 5, 2013
Saturday, June 8, 2013
Passed the Rough Inspection
What a relief!!! We passed the rough plumbing and electrical inspections. Finishing up the chinking inside today. And then (drum roll please) we are on to sheetrock, starting to see the end in sight.
Tuesday, December 11, 2012
Framing
Thursday, November 1, 2012
A Much Overdue Update
By the end of October we finished up on the outside of the cabin, that is except for the porches. Here are some pictures.
The Back Side
The Right Side
The Front
We are really pleased with the look!
Friday, May 11, 2012
Moving Right Along
We are staying as busy as possible to get the house done by Christmas. We have completed the siding on the gables with board and baton, installed all the flooring and have started on the doors and windows.
Since this post the doors are all in and we have started to sand the exterior walls and prep for staining and we will begin to install windows this weekend.
Since this post the doors are all in and we have started to sand the exterior walls and prep for staining and we will begin to install windows this weekend.
Wednesday, March 21, 2012
Update
Since our last post we have gained much ground.
We have finished the second floor t&g.
We have plumbed the main line into the house and ran the sewer line out.
We framed the first floor, insulated it and covered it with osb.
And we have sanded the entire first floor logs.
We have finished the second floor t&g.
We have plumbed the main line into the house and ran the sewer line out.
We framed the first floor, insulated it and covered it with osb.
And we have sanded the entire first floor logs.
Friday, January 13, 2012
Working on The Floor Joists
For the past few weeks we have been sanding logs, notching logs to fit hangers, chinking and setting the floor joists.