Wednesday, March 21, 2012

Update

Since our last post we have gained much ground.
We have finished the second floor t&g.
We have plumbed the main line into the house and ran the sewer line out.
We framed the first floor, insulated it and covered it with osb.



And we have sanded the entire first floor logs.

No comments:

Post a Comment